SAP C-TPLM30-67 Exam Info and Free Practice Test ActualPDF [Q58-Q78]

Share

SAP C-TPLM30-67 Exam Info and Free Practice Test | ActualPDF

Pass SAP C-TPLM30-67 Premium Files Test Engine pdf - Free Dumps Collection


SAP C-TPLM30-67 Exam Description:

The "SAP Certified Application Associate - SAP Maintenance & Repair with ERP 6.0 EHP7" certification exam verifies that the candidate possesses basic knowledge in the area of SAP Plant Maintenance. This certificate proves that the candidate has the required understanding within this consultant profile of the ERP solution, and can implement this knowledge practically in projects under guidance of an experienced consultant. It is recommended as an entry-level qualification to allow consultants to get acquainted with the fundamentals of SAP Maintenance & Repair.


C-TPLM30-67 Exam Certification Details:

Duration:180 mins
Sample Questions: SAP C-TPLM30-67 Exam Sample Question
Languages:German, English
Exam:80 questions
Cut Score:51%

 

NEW QUESTION 58
When is the latest possible point in time that you can create a settlement rule?

  • A. After technical completion
  • B. Before order release
  • C. After order release
  • D. Before technical completion

Answer: D

 

NEW QUESTION 59
Your customer needs a maintenance order type for use with Test Equipment Management in a maintenance plan.
Which Customizing setting must you make for the order type?

  • A. Create an order type for Test Equipment Management.
  • B. Assign an inspection type to an order type with plant assignment.
  • C. Assign an inspection lot to order type only.
  • D. Create a plant for inspection lots.

Answer: B

 

NEW QUESTION 60
You need to set up the iDRAC IP address on an SC Series controller with the following details:
* IP address 192.168.0.160
* subnet mask 255.255.255.0
* gateway 192.168.0.1
Which commands should be used to complete this task?
ifconfig inet set eth0 ip 192.168.0.160

  • A. platform bmc set netmask 255.255.255.0
    platform bmc set gateway 192.168.0.1
  • B. ifconfig inet set eth0 netmask 255.255.255.0
    ifconfig inet set eth0 gateway 192.168.0.1
    ifconfig inet set eth1 ip 192.168.0.160
  • C. controller ipconfig set eth0 netmask 255.255.255.0
    controller ipconfig set eth0 gateway 192.168.0.1
    platform bmc set ip 192.168.0.160
  • D. ifconfig inet set eth1 netmask 255.255.255.0
    ifconfig inet set eth1 gateway 192.168.0.1
    controller ipconfig set eth0 ip 192.168.0.160

Answer: A

 

NEW QUESTION 61
What does the serial number profile control?
Please choose the correct answer.
Response:

  • A. Whether a master batch is used for a serial number
  • B. Whether serial numbers must be assigned for a business transaction
  • C. Whether split valuation is used to describe the value of an individual part
  • D. Whether an individual part is assigned to a special stock

Answer: B

 

NEW QUESTION 62
What do you use to set up a refurbishment order for external refurbishment?
Please choose the correct answer.
Response:

  • A. An external operation that contains a control key for refurbishment.
  • B. An order type for external refurbishment and a material item with item category External
    Refurbishment.
  • C. An order type for external refurbishment and an assignment of a material with split valuation.
  • D. An external operation that contains a subcontracting indicator and a material item with a material provision indicator activated.

Answer: D

 

NEW QUESTION 63
What does the scheduling period determine in the maintenance plan scheduling parameters?

  • A. The duration for which the system generates maintenance orders immediately
  • B. The duration for which the system generates planned or call dates during scheduling
  • C. The validity period of the maintenance plan
  • D. The duration for which the system generates maintenance notifications immediately

Answer: B

 

NEW QUESTION 64
What information does the value category provide in the maintenance order?

  • A. The material costs by valuation category
  • B. The costs by work center
  • C. The costs details for individual technical objects
  • D. A summary of costs for multiple cost elements

Answer: D

 

NEW QUESTION 65
Which SC Series licenses are applied at the factory?

  • A. SC8000 and SC9000
  • B. SCv2000 and SC8000
  • C. SC7020 and SCv2000
  • D. SC4020 and SC7020

Answer: C

 

NEW QUESTION 66
Which of the following always produces up-to-the-minute costing information for maintenance orders?
Please choose the correct answer.
Response:

  • A. A standard query in SAP Net Weaver Business Warehouse
  • B. A maintenance order list
  • C. A standard analysis from the Plant Maintenance Information System (PMIS)
  • D. A shift report based on shift notes

Answer: B

 

NEW QUESTION 67
What do you need to select when you create a maintenance plan that only generates notification(s)?
Please choose the correct answer.
Response:

  • A. A specific maintenance strategy for notifications
  • B. A specific notification type for maintenance plans
  • C. A maintenance plan category for notifications
  • D. A specific notification type that includes a task list

Answer: C

 

NEW QUESTION 68
Which standard aggregation of data does the Plant Maintenance Information System (PMIS) use?
(Choose three)

  • A. By characteristics
  • B. By data source
  • C. By key figures
  • D. By date period
  • E. By info source

Answer: A,C,D

 

NEW QUESTION 69
Which of the following Customizing settings is required to assign a notification to a maintenance order operation?

  • A. Assignment of operations to all object list entries active
  • B. Assignment of order type to notification type
  • C. Create default value profiles for general order data
  • D. Maintain indicator for notification data on order header

Answer: A

 

NEW QUESTION 70
Name the data which is created during the monitoring, controlling, regulation and optimization of a technical process.
Please choose the correct answer.
Response:

  • A. Process control system
  • B. WAMP
  • C. Document entry
  • D. Measurement system

Answer: A

 

NEW QUESTION 71
All maintenance plans in your systems are scheduled automatically via deadline monitoring.
What happens when you set a manual call?

  • A. The waiting call dates are re-scheduled on the basis of the manual call.
  • B. The original scheduled dates of the maintenance plan remain.
  • C. All scheduled calls on hold are skipped.
  • D. All scheduled calls on hold are deleted.

Answer: B

 

NEW QUESTION 72
Your customer executes deadline monitoring (transaction IP30).
What happens after you insert additional call dates using the manual call function?

  • A. The system restarts the maintenance plan.
  • B. The system retains the normal scheduled call dates.
  • C. The system reschedules all previous scheduled call dates.
  • D. The system fixes the next scheduled call date.

Answer: B

 

NEW QUESTION 73
Which of the following rules applies to user status in orders and notifications?

  • A. Changes to the user status can affect authorizations.
  • B. When a user status is flagged as an initial status, it overrides the initial system status CRTD.
  • C. When you set a new user status with a status number, the previous user status with status number is deactivated.
  • D. The user status in the notification can be copied into the order.

Answer: C

 

NEW QUESTION 74
What do you mean by the term PMIS.
Please choose the correct answer.
Response:

  • A. Project management system
  • B. Project maintenance information system
  • C. Plant maintenance information system
  • D. Process management system

Answer: C

 

NEW QUESTION 75
In which lifecycle scenarios can you use SAP Solution Manager? (Choose three)

  • A. Implementation
  • B. Scoping
  • C. Optimization
  • D. Retirement
  • E. Operations

Answer: A,C,E

 

NEW QUESTION 76
Your customer needs a maintenance order type for use with Test Equipment Management in a maintenance plan.
Which Customizing setting must you make for the order type?

  • A. Create an order type for Test Equipment Management.
  • B. Assign an inspection type to an order type with plant assignment.
  • C. Assign an inspection lot to order type only.
  • D. Create a plant for inspection lots.

Answer: B

 

NEW QUESTION 77
You customize an order type to release orders immediately upon creation, and you assign the order type to a maintenance item.
How can a user override the automatic release of the order without creating a new order type?
Please choose the correct answer.
Response:

  • A. Set the Do Not Release Immediately indicator in planning data for the maintenance item.
  • B. Select a maintenance activity type and set the Do Not Release Immediately indicator.
  • C. Select a maintenance planner group and set the Do Not Release Immediately indicator.
  • D. Set the Do Not Release Immediately indicator in the task list header.

Answer: A

 

NEW QUESTION 78
......

Updated Official licence for C-TPLM30-67 Certified by C-TPLM30-67 Dumps PDF: https://examsboost.actualpdf.com/C-TPLM30-67-real-questions.html