EMC DES-6322 Test Engine Dumps Training With 106 Questions [Q12-Q37]

Share

EMC DES-6322 Test Engine Dumps Training With 106 Questions

DES-6322 Questions Pass on Your First Attempt Dumps for DCS-IE Certified


Achieving the EMC DES-6322 certification demonstrates that the candidate has the knowledge and skills required to implement and deploy VxRail solutions successfully. Specialist - Implementation Engineer, VxRail Exam certification is recognized by employers globally and can enhance the candidate's career prospects. Specialist - Implementation Engineer, VxRail Exam certification is valid for two years, and candidates must recertify to keep their certification current.


DELL DES-6322 Exam Advantages

The Dell Certifications are well-respected by employers, allowing you to get your foot in the door faster. Dell Technologies is one of the largest companies in the world, and they are well known in many countries. Many people who work for Dell Technologies find that their employment opportunities continue to expand their whole careers. Witness this, Dell Technologies is one of the few companies that are still hiring. Remove your uncertainty about the DELL DES-6322 because it is a Dell Certification.

Appearance in the news, both regional and international, makes you recognizable. Requests for you as a speaker make you more prominent, and therefore more valuable. Doubt anyone who says this is not effective. Easy demo exams allow you to take the exams quickly and efficiently with excellent results. DES-6322 exam dumps and the help of the online testing centers allow you to pass the exams in a short time. Trusted by many large-scale companies around the world. One of the most effective certifications offered in IT. These types of certifications are recognized internationally. The connection created with the Dell community is valuable enough to have a career in IT.

 

NEW QUESTION # 12
What is a valid 2-node VxRail cluster configuration?

  • A. Series with 4x 10 GbE in a switch configuration
  • B. Series with 4x 25 GbE in a direct-connect configuration
  • C. Series with 2x 25 GbE in a switch configuration
  • D. Series with 4x 1 GbE in a direct-connect configuration

Answer: A


NEW QUESTION # 13
An implementation engineer is configuring the network firewall to support a VxRail installation. Where can they find the necessary firewall rules?

  • A. VxRail Configuration Portal
  • B. Network Validation Tool
  • C. Rack worksheet of the Network PEQ
  • D. As-Built Configuration Report

Answer: D


NEW QUESTION # 14
What is a consideration when performing a VxRail software upgrade from version 4.7.xxx to version 7.0.xxx?

  • A. Secure boot must be enabled on the ESXi hosts for a successful upgrade
  • B. vCenter Server requires a temporary IP address on a different subnet before the upgrade
  • C. External vCenter server must be upgraded after the VxRail is upgraded
  • D. VxRail Manager VM must be changed to the default name to avoid an upgrade failure

Answer: C


NEW QUESTION # 15
What is validated by running the Proactive VM Creation test in vCenter on a VxRail cluster?

  • A. Network firewalls are configured correctly
  • B. vSAN operates successfully
  • C. vSAN has sufficient storage capacity
  • D. Network performance is sufficient

Answer: B


NEW QUESTION # 16
A VxRail cluster is being deployed in a DMZ environment. What is the recommended deployment option?

  • A. Internal vCenter Server with internal DNS
  • B. External vCenter Server with customer-supplied VDS
  • C. Internal vCenter Server with external DNS
  • D. External vCenter Server with VxRail-deployed VDS

Answer: C


NEW QUESTION # 17
Match each component of the VxRail HCI System Software to its description.

Answer:

Explanation:


NEW QUESTION # 18
An implementation engineer places a VxRail node into maintenance mode using the Ensure accessibility setting What is the engineer likely planning to do?

  • A. Shutdown of an entire cluster
  • B. Temporary maintenance
  • C. Extensive maintenance
  • D. Permanent removal of host from cluster

Answer: C


NEW QUESTION # 19
What is a benefit of using the VxRail REST API?

  • A. Polling for vSAN performance statistics
  • B. Automated security audit of VxRail clusters
  • C. Remote upgrades of iDRAC related software only
  • D. Automated log collection for VxRail clusters

Answer: D


NEW QUESTION # 20
Match each IDRAC Maintenance page tab to its description.

Answer:

Explanation:


NEW QUESTION # 21
What is a difference between vSAN Data-In-Transit Encryption and vSAN Data-At-Rest-Encryption?

  • A. Data-In-Transit Encryption: Addresses fear of media theft Data-At-Rest Encryption: Addresses fear of rogue administrators
  • B. Data-In-Transit Encryption: Encrypts traffic between VMs and the VxRail nodes Data-At-Rest Encryption: Encrypts traffic between VxRail nodes only
  • C. Data-In-Transit Encryption: Key Management Server must reside on the vSAN cluster Data-At-Rest Encryption: Key Management Server can reside on the vSAN cluster
  • D. Data-In-Transit Encryption: Does not require a Key Management Server Data-At-Rest Encryption: Requires a Key Management Server

Answer: D

Explanation:


NEW QUESTION # 22
A company needs to enable vSphere GPU capabilities on their VxRail cluster. To do so, they need to purchase a specific entitlement.
What licensing satisfies this requirement?

  • A. vSphere Standard
  • B. vSphere Enterprise Plus
  • C. vSAN Advanced Edition
  • D. vSAN Enterprise Plus Edition

Answer: B

Explanation:


NEW QUESTION # 23
For which typical activity would the Full data migration setting be used when placing a VxRail host into maintenance mode?

  • A. Permanently removing host from cluster
  • B. Temporary maintenance
  • C. Shutting down an entire cluster
  • D. Rebooting a single ESXi host

Answer: A

Explanation:


NEW QUESTION # 24
Match each component of the VxRail HCI System Software to its description.

Answer:

Explanation:


NEW QUESTION # 25
What is the recommended format for host names when using the VxRail Deployment Wizard for an External vCenter solution?

  • A. Host name for vCenter Server FQDN for VxRail Manager
  • B. FQDN for both vCenter Server and for VxRail Manager
  • C. Host name for both vCenter Server and for VxRail Manager
  • D. FQDN for vCenter Server Host name for VxRail Manager

Answer: D


NEW QUESTION # 26
Which VxRail model can only be installed with static rack rails?

  • A. S Series
  • B. V Series
  • C. G Series
  • D. P Series

Answer: B


NEW QUESTION # 27
An implementation engineer is deploying a VxRail cluster with the VxRail Deployment Wizard Which user accounts must be defined for VxRail Manager?

  • A. VxRail Manager root account VxRail Manager service account
  • B. vCenter root account VxRail Manager service account
  • C. VxRail Manager service account vCenter service account
  • D. VxRail Manager root account vCenter service account

Answer: A


NEW QUESTION # 28
A VxRail cluster 4.7.xxx environment is managed by the internal vCenter Server. An implementation engineer plans to deploy a new VxRail cluster using the existing vCenter Server instance, then use the customer-supplied VDS to manage both VxRail clusters.
What must be done?

  • A. Migrate the internal vCenter Server to an external vCenter Server, then merge the PSC
  • B. Upgrade the internal vCenter Server to version 7.0
  • C. Upgrade the VxRail version from 4.7.xxx to 7.0.000
  • D. Migrate the internal vCenter Server to an external vCenter Server, then upgrade the VxRail 4.7.xxx to 7.0.100

Answer: C


NEW QUESTION # 29
An implementation engineer is deploying a new VxRail cluster. What should they confirm before installing the hardware?

  • A. At least 36 in (92 cm) clearance exists in front of and behind the cabinet
  • B. Service laptop must be on the same IP network as the iDRACs
  • C. Single power zone must be used with adequate power cables
  • D. Power distribution must support the power rating of a single node

Answer: A


NEW QUESTION # 30
What are the requirements for a customer-supplied VDS in a VxRail deployment?

  • A. 4 or 8 uplinks
    Port groups for Discovery, Management, vMotion, and vSAN only
  • B. 2 or 4 uplinks
    Port groups for Discovery, Management vCenter Server, vMotion, and vSAN
  • C. 4 or 8 uplinks
    Port groups for Discovery, Management, vCenter Server, vMotion, and vSAN
  • D. 2 or 4 uplinks
    Port groups for Discovery, Management, vMotion, and vSAN only

Answer: A


NEW QUESTION # 31
How must node ports on Dell EMC ToR switches be configured when the Spanning Tree Protocol is enabled in an environment?

  • A. As access ports
  • B. As edge ports
  • C. In Forwarding status
  • D. In Port-Channel mode

Answer: B


NEW QUESTION # 32
An implementation engineer logs in to the vSphere Client of a recently deployed VxRail cluster. They want to review the firmware versions on the VxRail nodes.
Which view should they use to gather this information?

  • A. Host and Clusters > VxRail Host > Monitor > VxRail > Physical View
  • B. Hosts and Clusters > VxRail Cluster > Monitor > VxRail > Appliances
  • C. Hosts and Clusters > VxRail Cluster > Configure > VxRail > System
  • D. Hosts and Clusters > VxRail Host > Configure > VxRail > iDRAC Configuration

Answer: D


NEW QUESTION # 33
An implementation engineer is expanding an existing VxRail S Series cluster with an additional node. The version of the node is not at the current cluster level but is compatible.
What procedure would result in the quickest node addition?

  • A. VxRail Node Imaging Management
  • B. Compute node expansion
  • C. RASR Factory Image Upgrade
  • D. Factory Reset

Answer: C


NEW QUESTION # 34
What environmental components of a 3-node VxRail cluster must be assigned IP addresses?

  • A. ESXi Mgmt, vSAN, vMotion, and iDRAC
  • B. vSAN, Witness Traffic Separation, vRealize Log Insight, and vMotion
  • C. vRealize Log Insight. vSAN, VxRail Manager, and SRS
  • D. ESXi Mgmt, vCenter, Witness Traffic Separation, and iDRAC

Answer: A


NEW QUESTION # 35
Which requirement must be met when expanding a 3-node VxRail G560F cluster with a fourth G Series node in the same chassis?

  • A. Node hardware must be identical to the other three nodes
  • B. PCIe network card must be added to all nodes
  • C. New node must be at the same VxRail version as existing nodes
  • D. Node requires only the same drive configuration

Answer: D


NEW QUESTION # 36
A systems engineer is tasked to configure a VxRail cluster and notices that the VxRail Deployment Wizard fails to launch. The engineer discovers that the software is corrupted.
What should the engineer do to address the issue?

  • A. Return the nodes to the original build state
  • B. Check vCenter and troubleshoot the build failure
  • C. Use the VMware Host Client and iDRAC to access the nodes for troubleshooting
  • D. Verify that the JSON file is not corrupted and has all the required values

Answer: A


NEW QUESTION # 37
......

DES-6322 Practice Test Pdf Exam Material: https://examsboost.actualpdf.com/DES-6322-real-questions.html